Asbestos Management Plan

management planThe management plan is used to:

  • Determine the
    relative degree of hazard posed by the various asbestos containing
    building material (ACBM)
  • Prescribe recommended response actions and timing of those actions
  • Prescribe recommended management practices
    (the operations and maintenance program) for any ACBM

All management plans are required by AHERA for schools and include:

  • Identification of ACBM which remains after response actions are taken
  • Description of hazard assessments for all confirmed and assumed ACBM
  • Recommended prevention measures and/or response actions for all identified friable ACBM
  • Plan for periodically re-inspecting ACBM
  • Program for informing workers and building occupants (sometimes called “Awareness Training”)
  • Evaluation of resources needed to implement the management plan

General information:

  • Information from the asbestos building inspection is used to generate the management plan and must be updated every 3 years.

Contact us for more information and a complimentary needs consultation.

Facebook Logo Twitter Logo Google+ Logo LinkedIn Logo

Impact7G515-473-6256 | info@impact7g.com | | 9550 Hickman Road, Suite 105, Clive, IA 50325